Manufacture of basic mechanical parts in short cycles

Home » Manufacture of basic mechanical parts in short cycles

pieces-elementaires

 

 

 

 

 

Manufacture of basic mechanical parts in short cycles

In line with our policy of integration, we have at our Reims Prunay site a machine shop, a surface treatment workshop and a paint shop with the mounting of rings and balls in categories. This high level of integration allows us to guarantee reduced and controlled cycles.

MACHINING RESOURCES :

  • MAZAK VTC 200 vertical production centre Travel x 1660 y 510 z 510pieces-1
  • SIGMA production centre for hard metals Spindle speed of 4500 revolutions / 2 palettes/60 tools / Spindle power of 18.5 kW / Speed of 1-8000m/min Travel x 1400 y 650 z 650
  • MAZAK VORTEX 5-axis vertical production centre Spindle speed of 10,000 revolutions / Spindle power of 30 kW / Angles A+-30°B+-30° Travel x 4220 y 1400 z 610
  • Centre for the manufacture of 5 axes palettised CRENO Broach speed of 20 000 revolutions/Broach power of 15 KW/Rapid displacement of 20m/min Angles A+-135°B+-280°/ Courses X 5800 Y 1400 x 2 Z 1000
  • CRENO 5-axis palettised production centre Spindle speed of 20,000 revolutions / Spindle power of 15 kW / Rapid displacement of 20m/min Angles A+-135°B+-280°/ Travel x 5800 y 1400 x 2 z 1000
  • MAZAK FH5800 production centre 4 axes 6 pallets Spindle speed of 25,000 revolutions / Spindle power of 30 kW / Rapid displacement of 50m/min Travel x 700 y 700 z 700

 

 

 

SURFACE TREATMENT EQUIPMENT :

  • Treatment OAC L 3600 x l800 x H1580pieces-2
  • OAC sealed class 1 BF5
  • OAT
  • PROTECTION Alodine 1200
  • 1 penetrant cabin with 2 penetrants level niveau 2 et 2 penetrants level niveau 1 for pénétrant of classe S3

 

 

 

PAINTING EQUIPMENT :

  • Cabin Paint for the WP L15800xl17300xH4600mmpieces-3
  • Cabin Paint under controlled atmosphere Maximum dimension of parts L1500xW1000xH800mm Complete polymerisation in 18 min 12 pods Automatic temperature and humidity control Capacité of 200 pods/day Total cycle of 36mn
  • Semi-automatic cabin with drying tunnel for primary parts
  • Hydrodilutable paint